Reviews

Kazakhstan plant with 177 T-72 tanks up for sale for 70.83 billion tenge

A T-72 tank in a repair workshop.

Photo: Pixabay / Pexels

Kazakhstan Engineering has put 100% of the shares in the Semey Engineering plant up for sale for 70.83 billion tenge (kursiv.media). The auction is scheduled for November 27. The buyer will get a business with 177 T-72 tanks that has operated at a loss for the past two years.

What happened

The online auction, with bids rising from the starting price, will take place on E-qazyna at 11:00. Applications close at 10:55 that day. Investors must pay a security deposit of 10.6 billion tenge to take part.

The starting price was set using a valuation report as of June 30, 2026. It was prepared by the Almaty company Ernst & Young Advisory Services. The plant’s military equipment accounts for most of its assessed value.

Alongside the 177 T-72 tanks, the plant has 104 BMP-1 infantry fighting vehicles. The inventory also lists 23 BRDM-2 armoured reconnaissance and patrol vehicles and 35 BTR-70 armoured personnel carriers.

What this means for the buyer

The equipment has not undergone fault checks or repairs since a visual inspection in 2017–2018. The valuation allows for the vehicles to be sold in Kazakhstan or abroad, but there are no previous transactions to use as comparisons.

“The equipment may be sold to Kazakh defence industry organisations or foreign legal entities with an export licence, but there have been no previous sales of such equipment,” the valuation report says.

The plant repairs tanks, armoured personnel carriers, artillery systems, and engines for military and dual use. It also handles specialised equipment, including tracked towing vehicles and tank-based armoured fire engines.

The plant’s finances ahead of the sale

Semey Engineering posted a loss of 105 million tenge in 2025, compared with 276.6 million a year earlier. Revenue from state defence orders barely changed: 8.17 billion versus 8.05 billion tenge. Meanwhile, the cost of sales rose from 7.7 billion to 8.9 billion tenge.

Administrative expenses almost doubled to 962.3 million tenge. Accumulated losses stood at 3.5 billion tenge at the end of 2025. As of October 30, 2026, the plant owed Kazakhstan Engineering 2.9 billion tenge in dividends for 2014.

The sole shareholder had previously allocated 2 billion tenge to increase the plant’s share capital. The money was intended to expand and upgrade its workshops, but no such work took place in 2025. The next step in the sale is the auction on November 27.

Понравился материал? Поделитесь с другими:

Picture of Раимбек Искендиров
Раимбек Искендиров
Picture of Раимбек Искендиров
Раимбек Искендиров

Похожие материалы

Close-up of a “Bank” sign at the entrance to a bank branch, with no recognisable branding.

Reviews

Rakishev sells Ukraine’s BTA Bank after six years of trying

Ukraine’s BTA Bank has been bought by NovaPay Invest, part of NOVA, which owns ...
Close-up of a search bar and temporary chat icon on a screen, with no people or promises of complete anonymity.

AI

Google adds temporary chats to AI search: conversations disappear after 24 hours

Google AI Mode is rolling out temporary chats that disappear after 24 hours, stay ...
Turbine hall with large power-generating equipment at a combined heat and power plant whose owner raised money through bonds.

Reviews

Owner of Almaty’s three CHP plants raises 34.77 billion tenge, with repayment due in 2039

AlES has issued 34.77 billion tenge in bonds, with principal and accrued interest due ...

Читайте нас в Telegram и Instagram

Подписывайтесь на наши каналы, чтобы первыми получать самые свежие новости казахстанской IT-индустрии, анонсы грантов, стажировок и эксклюзивные интервью.